Get Free Consultation!
We are ready to answer right now! Sign up for a free consultation.
I consent to the processing of personal data and agree with the user agreement and privacy policy
High wear-resistant TBM roller disc cutters for railway & metro tunnels. Adaptable to varied rock strata, wholesale pricing.
|
Cutter Structure
|
Assembly / Monoblock
|
|
Feature
|
30-150MPa
|
|
Applicable Equipment
|
Tunnel boring machine (TBM / MTBM), Shield machine, Pipe jacking machine, Small boring unit (SBU), etc.
|
|
Material
|
Mold Steel + Tungsten carbide
|
|
Cutter type
|
face/gauge/centre cutter
|
|
Diameter
|
381mm
|
|
Size
|
15‘’
|
|
Bearing
|
heavyduty tapered roller bearing
|
|
Rated load
|
176KN
|
Raj International is a leading manufacturer and supplier of drilling tools for piling and foundation equipment, supported by experienced engineers and skilled professionals with extensive knowledge of foundation drilling and construction. The company focuses on delivering reliable, high-quality drilling solutions with advanced manufacturing facilities and modern production technology.
With experience in major and complex foundation projects, Raj International has contributed to projects such as Delhi Metro, Chennai Metro, Mumbai Metro and Monorail, building a strong reputation for quality products and dependable services. The company also offers customized drilling tools to meet specific client requirements, backed by dedicated production, quality testing, packaging and warehouse facilities.
Q1. What’s the nature of your company, manufacturer or trading company?
Ans: We are Manufacturer. All products are produced by ourselves, so we have competitive prices while ensuring product quality.
Q2. How do you ship the products?
Ans: Our goods can be transported by air and sea.
Q3. Does this product support customization?
Ans: Yes, due to the fact that we have our own factories, we can customize the product according to the customer’s requirements.
Q4. How long is your delivery time?
Ans: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.